Projects

2026

2026 – current projects

  • Construction and installation works for the technological connection of new consumers in the territories of Armavir and Aragatsotn regions of the Republic of Armenia (Musaler branch) for the needs of “Electric Networks of Armenia” CJSC
  • Construction and installation works for the power supply for the needs of [“Zangezur Copper Molybdenum Combine ](https://www.zcmc.am/)CJSC” as part of the reconstruction project.

2025

2024-2025 – executed projects

  • Construction and installation works of 110/10-10kV 25MVA electrical substation, FL-110kV and VL-10kV for the needs of Artashat greenhouse farm, located at Yerevan-Yeraskh highway 8, 8/1, Ararat region, Shahumyan community, Customer “Spayka” LLC
  • Installation works of 6kV VL from 110kV Noragavit substation for the needs of cheese factory located at Artashat highway 37/2, Yerevan, Customer “Spayka” LLC
  • Construction of 8 substations for artificial lighting of greenhouse blocks F1 and F2 Noragavit, Yerevan, Customer “Spayka” LLC.
  • Maintenance of the chemical laboratory of Copper-Molybdenum factory of “Teghout” CJSC
  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia
  • Construction and power supply works on rooftop and greenfield mobile stations in Yerevan and other regions of Armenia (MTS-Armenia, Ucom, Telecom Armenia CJSC)
  • Reconstruction and repair of mobile stations power lines in Yerevan and other regions of Armenia (MTS-Armenia, Ucom Telecom Armenia CJSC)

2023

Works executed in 2023

  • Construction of 110/10kV new substation located at 1 Gortsaranayin str., v.Gagarin, Gegharkunik region for the needs of “Art-Group” CJSC
  • Construction of 110kV single circuit transmission line for the power supply of 110/10kV substation located at 1 Gortsaranayin str., v.Gagarin, Gegharkunik region for the needs of “Ricast” CJSC.
  • Construction, power supply works, repair and technical maintenance of substations belonging to company “Plant of pure Iron” OJSC
  • Construction, power supply works, repair and technical maintenance of substations belonging to company “AMP Holding” LLC
  • Maintenance of the chemical laboratory of Copper-Molybdenum factory of “Teghout” CJSC
  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia
  • Construction and power supply works on rooftop and greenfield mobile stations in Yerevan and other regions of Armenia (MTS-Armenia, Ucom, Telecom Armenia CJSC)
  • Reconstruction and repair of mobile stations power lines in Yerevan and other regions of Armenia (MTS-Armenia, Telecom Armenia CJSC)

2022

Works executed in 2022

  • Power installation works for the construction of 6/0,4kV 2x1600kVa transformer substation, Customer: “Armswiss Properties” CJSC.
  • Power installation works for upgrading of the external power supply of “Diagnostic centre”, Customer: “Diagnostica” Medical Corporation OJSC.
  • Construction, power supply works, repair and technical maintenance of substations belonging to company “Plant of pure Iron” OJSC
  • Construction, power supply works, repair and technical maintenance of substations belonging to company “AMP Holding” LLC
  • Maintenance of the chemical laboratory of Copper-Molybdenum factory of “Teghout” CJSC
  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia
  • Construction and power supply works on rooftop and greenfield mobile stations in Yerevan and other regions of Armenia (MTS-Armenia, Ucom)
  • Reconstruction and repair of mobile stations power lines in Yerevan and other regions of Armenia (MTS-Armenia, Ucom)

2021

Works executed in 2020 and 2021

  • Laying of cable and overhead power transmission lines (35 /10kV, 35kV KL, 35KV VL, 10 / 04kV P / S, 10kV and 4kV KL) for 277MW solar power station, construction of substation. Customer: “Solar Farm” LLC
  • Construction of 110kW overhead power line of “Goris-1,2”
  • Installation of ventilation system and maintenance in the chemical laboratory of Copper-Molybdenum factory of “Teghout” CJSC
  • Construction, power supply works, repair and technical maintenance of substations belonging to company “Plant of pure Iron” OJSC
  • Construction, power supply works, repair and technical maintenance of substations belonging to company “AMP Holding” LLC
  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia
  • Construction and power supply works on rooftop and greenfield mobile stations in Yerevan and other regions of Armenia (MTS-Armenia, Ucom)
  • Reconstruction and repair of mobile stations power lines in Yerevan and other regions of Armenia (MTS-Armenia, Ucom)

2019

Works executed in 2019

  • 220/110/6kW «Agarak 2» substation reconstruction works financed by Asian Development Bank within the framework of the Power Transmission Rehabilitation project – as Subcontractor
  • 220/110/35/6kW «Shinuhayr» substation reconstruction works financed by Asian Development Bank within the framework of the Power Transmission Rehabilitation project – as Subcontractor
  • Construcion of 110kW overhead power of “Goris-1,2”
  • Electrical installation works of new transformer substation on the territory of OJSC “Plant of pure Iron”
  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia
  • Construction and power supply works on rooftop and greenfield mobile stations in Yerevan and other regions of Armenia (MTS-Armenia)
  • Reconstruction and repair of mobile stations power lines in Yerevan and other regions of Armenia (MTS-Armenia)

2018

Works executed in 2018

  • 220/110/6kW «Agarak 2» substation reconstruction works financed by Asian Development Bank within the framework of the Power Transmission Rehabilitation project – as Subcontractor
  • 220/110/35/6kW «Shinuhayr» substation reconstruction works financed by Asian Development Bank within the framework of the Power Transmission Rehabilitation project – as Subcontractor
  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia
  • Construction and power supply works on rooftop and greenfield mobile stations in Yerevan and other regions of Armenia (MTS-Armenia)
  • Reconstruction and repair of mobile stations power lines in Yerevan and other regions of Armenia (MTS-Armenia)
  • Reconstruction works in the company office sites and service centers (MTS-Armenia)
  • Electric installation works in substation with 2*630 transformers belonging to Chinese Language School in Armenia
  • Equipment supply and electric installation works in the territory of “Rao Mars” CJSC
  • Installation of ventilation system and maintenance in the canteens of Copper-Molybdenum factory of “Teghout” CJSC

2017

Works executed in 2017

  • 220/110/6kW «Agarak 2» substation reconstruction works – as Subcontractor
  • 220/110/35/6kW «Shinuhayr» substation reconstruction works – as Subcontractor
  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia
  • Construction and power supply works on rooftop and greenfield mobile stations in Yerevan and other regions of Armenia (MTS-Armenia, Ucom)
  • Reconstruction and repair of mobile stations power lines in Yerevan and other regions of Armenia (MTS-Armenia, Ucom)
  • Reconstruction works in the company office sites and service centers (MTS-Armenia, Ucom)

2016

Works executed in 2016

Customer – Electrical Network of Armenia CJSC

  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia
  • 4kVand 35kV 6/4kV cable line power supply to the new housing estate complex of “Elite Holding” LLC at Zaryan str.,
  • Construction assembling works of 6kV aerial circuit and installation of CTS 250 in v.Arindz, “Abovyan” el.network,
  • Power supply with 6kV cable line of CTS 160kVa in the territory belonging to A.Sargksyan on Artashat Highway 67/1,
  • Reconstrcution of 4kV aerial circuit TS 242 in city of Gyumri, “Kars” branch,
  • Reconstruction of “Gosh” 10kV aerial circuit some sections in “Dilijan” el.network, “Agstev” branch,
  • 6/4kV AC power supply of private house belonging to E.Movsesyan in Erebuni region,
  • Reconstruction of 4kV aerial circuit fed from substation 6323 in city of Armavir,
  • 6kV cable line power supply of TS 2*630kVA belonging to “Multi Group” Concern located at 21 Alek Manukyan str., Yerevan,
  • 6kV CL power supply to CTS 160/6kVA belonging to educational center 59016 located in v.Sotk, region of Gegharkunik,
  • 10kV cable-aerial line power supply of CTS belonging to Military Police located in v.Nerkin Getashen, “Martuni” el.network,
  • 4kV AC power supply to substation Aruch-1

Customer “UCom” LLC

  • Construction of open aerial transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of closed (cable) transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of rooftop mobile stations in Yerevan and other regions of Armenia
  • Construction of  tower mobile stations (Greenfield) in Yerevan and other regions of Armenia
  • Power repair works on rooftop mobile stations in Yerevan and other regions of Armenia,
  • Power repair works on  tower mobile stations (Greenfield) in Yerevan and other regions of Armenia

Customer “Vivacell” CJSC

  • Construction of open aerial transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of closed (cable) transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of rooftop mobile stations in Yerevan and other regions of Armenia
  • Construction of  tower mobile stations (Greenfield) in Yerevan and other regions of Armenia
  • Reconstruction of mobile stations power lines in Yerevan and other regions of Armenia
  • Reconstruction works in the company office sites and service centers

Customer “ArmenTel” CJSC

  • Power repair works on rooftop and Greenfield mobile stations in Yerevan and other regions of Armenia,
  • Reconstruction works in the company office sites and service centers
  • Installation and construction works on broadband access network

2015

Works executed in 2015

Customer – Electrical Network of Armenia CJSC

  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV,
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia:  4kVand 35kV

Customer “Orange-Armenia” CJSC

  • Construction of open aerial transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of closed (cable) transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of rooftop mobile stations in Yerevan and other regions of Armenia
  • Construction of  tower mobile stations (Greenfield) in Yerevan and other regions of Armenia
  • GSM/DCS/WCDMA/UMTS network deployment including BTS (vendor: NSN), power back-up systems (vendor: ELTEK) installation and commissioning, BTS upgrades, MW links installation and commissioning(vendor: ALU), MW links swap/upgrades.***

Customer “Vallex Group” CJSC

  • Installation works in the Copper-Molybdenum factory of “Teghout” CJSC
  • Installation and regulation of automatic control systems
  • Thermo-insulation and heating works for pipelines, tanks and other units supplying the equipment
  • Relocation of 35kW aerial circuit belonging to “Teghout” CJSC.

2014

Works executed in 2014

Customer – Electrical Network of Armenia CJSC

  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV,
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia:  4kVand 35kV

Customer “Orange-Armenia” CJSC

  • Construction of open aerial transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of closed (cable) transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of rooftop mobile stations in Yerevan and other regions of Armenia
  • Construction of  tower mobile stations (Greenfield) in Yerevan and other regions of Armenia
  • GSM/DCS/WCDMA/UMTS network deployment including BTS (vendor: NSN), power back-up systems (vendor: ELTEK) installation and commissioning, BTS upgrades, MW links installation and commissioning(vendor: ALU), MW links swap/upgrades.***

Customer “Vallex Group” CJSC

  • Installation and regulation of automatic control systems
  • Thermo-insulation and heating works for pipelines, tanks and other units supplying the equipment

Arzni Hydro Electro Station

Dismantling and mounting of Arzni HES 110kV “Aringe” and 110kV “Hrazdan” HV power lines.

2013

Works executed in 2013

Customer – Electrical Network of Armenia CJSC

  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV,
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia:  4kVand 35kV

Customer “Orange-Armenia” CJSC

  • Construction of open aerial transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of closed (cable) transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of rooftop mobile stations in Yerevan and other regions of Armenia
  • Construction of  tower mobile stations (Greenfield) in Yerevan and other regions of Armenia
  • GSM/DCS/WCDMA/UMTS network deployment including BTS(vendor: NSN), power back-up systems(vendor: ELTEK) installation and commissioning, BTS upgrades, MW links installation and commissioning(vendor: ALU), MW links swap/upgrades.

2012

Works executed in 2012

Customer – Electrical Network of Armenia CJSC

  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV,
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia:  4kVand 35kV
  • Importing of 35/110kV line hardware

Customer “Orange-Armenia” CJSC

  • Construction of open aerial transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of closed (cable) transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of rooftop mobile stations in Yerevan and other regions of Armenia
  • Construction of  tower mobile stations (Greenfield) in Yerevan and other regions of Armenia
  • GSM/DCS/WCDMA/UMTS network deployment including BTS(vendor: NSN), power back-up systems(vendor: ELTEK) installation and commissioning, BTS upgrades, MW links installation and commissioning(vendor: ALU), MW links swap/upgrades.

Customer LLC “South Caucasus Railway”

  • Capital repair of passenger platform Jrapi
  • Capital repair of passenger platform Shirakavan

2011

Works executed in 2011

Customer – “Intracom Armenia” LLC

  • Construction of 8m and 30m mobile stations in Yerevan and regions of RA

Customer – Electrical Network of Armenia CJSC

  • Construction of open aerial transmission facilities: 4kV
  • Construction of open aerial transmission facilities: 10kV
  • Construction of closed (cable) transmission facilities:  4k
  • In closed substations replacement of 6kV cells with vacuum switches: “Achn” 35/10kV, “Komitas” 35/6kV, “Charents” 35/6kV-47 cells,
  • Importing of 35/110kV line hardware
  • Importing of 35/110kV line insulators

Customer “Orange-Armenia” CJSC

  • Construction of open aerial transmission facilities: 4kV
  • Construction of closed (cable) transmission facilities: 4kV
  • Construction of mobile stations in the territory of Armenia
  • Importing of 5m wooden poles

Customer LLC “Imexgroup”

  • Complete assembling of 2x1000kV substation in “Aral” factory with installation of low and high voltage facilities and switches.
  • Installation, regulation and testing of industrial machines.

2010

Works executed in 2010

“Electrical Networks of Armenia” CJSC

Substation Shahumyan 35-110kV

  • Fence repair in “Shahumyan 1” substation,
  • Construction of grease trap in Shahumyan 1 substation,
  • Substation building repair, heating, lighting systems installations,
  • Substation building construction works,
  • “Shahumyan 1” substation repair.

Substation “Hyusisayin” 35-110kV

  • Dismantling works of the Substation building 2nd floor
  • Installation of cable trays and laying of pipes
  • Installation of control panels and chargers
  • Preparation of grease trap, grease outle, grease collector for the power transformer,
  • Mounting of two gates for the substation fence
  • Dismantling of portals and switches
  • Reconstruction of control building, portal rooms and switches
  • Substation portals foundations strengthening
  • Installation of reactors for two transformers: reactor type – XKGKL-6-4000-

Substation “Kentronakan” 35-110kV

  • Installation of reactors for two transformers. Reactor type: XKGKL-6-6000-6,

Substation “Abovyan” 110/35/10kV

  • Installation and assembling of 35kV portal beams.
  • Installation of 35kV portal for the second transformer

“Orange-Armenia” CJSC

  • Construction of open aerial transmission facilities: 4kV-2km, 10kV
  • Construction of transmission facilities closed and aerial. 4kV
  • Laying of underground cables:  10kV
  • Construction of mobile stations in the territory of Armenia
  • Construction of 35/4kV substations in the regions of Armenia

2009

Works executed in 2008 and 2009

“Electrical Networks of Armenia” CJSC

  • Repair and installation of accumulator batteries in substation 110/35/10kV “Etchmiatsin”,
  • Repair and installation of accumulator batteries, construction of grease removal system, stormwater drain system and r/c fence in substation 110/35/10kV  “Aparan”,
  • Repair and installations of accumulator batteries and  construction of grease removal system in substation 110/35/10kV  “Shahumyan-1”, OCP building capital repair

“Imexgroup” LTD

  • Construction and overall assembling of substation  2x1000kW “Nar-Dos 68”
  • Construction and overall assembling of substation  4x1000kW “Northern avenue”

“Intracom Armenia” LLC

  • Construction of 8m and 30m mobile stations

Other projects

  • Construction of open aerial transmission facilities: 4kW-8km, 10kW
  • Construction of closed (cable) aerial transmission facilities:  4kW
  • Laying of underground cables: 10kW
  • Construction of 40m mobile stations
  • Construction and assembling of generators, substation and transmission facilities in 2mW Hydroelectric Power plant “Byurakan”