Works executed in 2015

2015

Customer – Electrical Network of Armenia CJSC

  • Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV & 10kV,
  • Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia:  4kVand 35kV

Customer “Orange-Armenia” CJSC

  • Construction of open aerial transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of closed (cable) transmission facilities in Yerevan and other regions of Armenia: 4kV
  • Construction of rooftop mobile stations in Yerevan and other regions of Armenia
  • Construction of  tower mobile stations (Greenfield) in Yerevan and other regions of Armenia
  • GSM/DCS/WCDMA/UMTS network deployment including BTS (vendor: NSN), power back-up systems (vendor: ELTEK) installation and commissioning, BTS upgrades, MW links installation and commissioning(vendor: ALU), MW links swap/upgrades.***

Customer “Vallex Group” CJSC

  • Installation works in the Copper-Molybdenum factory of “Teghout” CJSC
  • Installation and regulation of automatic control systems
  • Thermo-insulation and heating works for pipelines, tanks and other units supplying the equipment
  • Relocation of 35kW aerial circuit belonging to “Teghout” CJSC.
← All Projects

Related Projects

2026 – current projects

2026

2024-2025 – executed projects

2025

Works executed in 2023

2023