Works executed in 2008 and 2009

2009

“Electrical Networks of Armenia” CJSC

  • Repair and installation of accumulator batteries in substation 110/35/10kV “Etchmiatsin”,
  • Repair and installation of accumulator batteries, construction of grease removal system, stormwater drain system and r/c fence in substation 110/35/10kV  “Aparan”,
  • Repair and installations of accumulator batteries and  construction of grease removal system in substation 110/35/10kV  “Shahumyan-1”, OCP building capital repair

“Imexgroup” LTD

  • Construction and overall assembling of substation  2x1000kW “Nar-Dos 68”
  • Construction and overall assembling of substation  4x1000kW “Northern avenue”

“Intracom Armenia” LLC

  • Construction of 8m and 30m mobile stations

Other projects

  • Construction of open aerial transmission facilities: 4kW-8km, 10kW
  • Construction of closed (cable) aerial transmission facilities:  4kW
  • Laying of underground cables: 10kW
  • Construction of 40m mobile stations
  • Construction and assembling of generators, substation and transmission facilities in 2mW Hydroelectric Power plant “Byurakan”