“Electrical Networks of Armenia” CJSC
- Repair and installation of accumulator batteries in substation 110/35/10kV “Etchmiatsin”,
- Repair and installation of accumulator batteries, construction of grease removal system, stormwater drain system and r/c fence in substation 110/35/10kV “Aparan”,
- Repair and installations of accumulator batteries and construction of grease removal system in substation 110/35/10kV “Shahumyan-1”, OCP building capital repair
“Imexgroup” LTD
- Construction and overall assembling of substation 2x1000kW “Nar-Dos 68”
- Construction and overall assembling of substation 4x1000kW “Northern avenue”
“Intracom Armenia” LLC
- Construction of 8m and 30m mobile stations
Other projects
- Construction of open aerial transmission facilities: 4kW-8km, 10kW
- Construction of closed (cable) aerial transmission facilities: 4kW
- Laying of underground cables: 10kW
- Construction of 40m mobile stations
- Construction and assembling of generators, substation and transmission facilities in 2mW Hydroelectric Power plant “Byurakan”