2010

“Electrical Networks of Armenia” CJSC

Substation Shahumyan 35-110kV

  • Fence repair in “Shahumyan 1” substation,
  • Construction of grease trap in Shahumyan 1 substation,
  • Substation building repair, heating, lighting systems installations,
  • Substation building construction works,
  • “Shahumyan 1” substation repair.

Substation “Hyusisayin” 35-110kV

  • Dismantling works of the Substation building 2nd floor
  • Installation of cable trays and laying of pipes
  • Installation of control panels and chargers
  • Preparation of grease trap, grease outle, grease collector for the power transformer,
  • Mounting of two gates for the substation fence
  • Dismantling of portals and switches
  • Reconstruction of control building, portal rooms and switches
  • Substation portals foundations strengthening
  • Installation of reactors for two transformers: reactor type – XKGKL-6-4000-

Substation “Kentronakan” 35-110kV

  • Installation of reactors for two transformers. Reactor type: XKGKL-6-6000-6,

Substation “Abovyan” 110/35/10kV

  • Installation and assembling of 35kV portal beams.
  • Installation of 35kV portal for the second transformer

“Orange-Armenia” CJSC

  • Construction of open aerial transmission facilities: 4kV-2km, 10kV
  • Construction of transmission facilities closed and aerial. 4kV
  • Laying of underground cables:  10kV
  • Construction of mobile stations in the territory of Armenia
  • Construction of 35/4kV substations in the regions of Armenia