{"id":9009,"date":"2026-03-27T23:00:37","date_gmt":"2026-03-27T20:00:37","guid":{"rendered":"http:\/\/kmc.test\/?post_type=project&#038;p=9009"},"modified":"2026-03-27T23:02:19","modified_gmt":"2026-03-27T20:02:19","slug":"projects-ref-2015","status":"publish","type":"project","link":"https:\/\/kmc.am\/en\/projects\/projects-ref-2015\/","title":{"rendered":"Works executed in 2015"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong><em>Customer\u00a0\u2013\u00a0Electrical\u00a0Network\u00a0of\u00a0Armenia\u00a0CJSC<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV &#038; 10kV,<\/li>\n\n\n<li>Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia:\u00a0 4kVand 35kV<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Customer \u201cOrange-Armenia\u201d CJSC<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of open aerial transmission facilities in Yerevan and other regions of Armenia: 4kV<\/li>\n\n\n<li>Construction of closed (cable) transmission facilities in Yerevan and other regions of Armenia: 4kV<\/li>\n\n\n<li>Construction of rooftop mobile stations in Yerevan and other regions of Armenia<\/li>\n\n\n<li>Construction of \u00a0tower mobile stations (Greenfield) in Yerevan and other regions of Armenia<\/li>\n\n\n<li>GSM\/DCS\/WCDMA\/UMTS network deployment including BTS (vendor: NSN), power back-up systems (vendor: ELTEK) installation and commissioning, BTS upgrades, MW links installation and commissioning(vendor: ALU), MW links swap\/upgrades.***<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Customer \u201cVallex Group\u201d CJSC<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Installation works in the Copper-Molybdenum factory of \u201cTeghout\u201d CJSC<\/li>\n\n\n<li>Installation and regulation of automatic control systems<\/li>\n\n\n<li>Thermo-insulation and heating works for pipelines, tanks and other units supplying the equipment<\/li>\n\n\n<li>Relocation of 35kW aerial circuit belonging to \u201cTeghout\u201d CJSC.<\/li>\n\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Customer\u00a0\u2013\u00a0Electrical\u00a0Network\u00a0of\u00a0Armenia\u00a0CJSC Customer \u201cOrange-Armenia\u201d CJSC Customer \u201cVallex Group\u201d CJSC<\/p>\n","protected":false},"featured_media":0,"template":"","project_cat":[16],"class_list":["post-9009","project","type-project","status-publish","hentry","project_cat-power-construction"],"_links":{"self":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project\/9009","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:attachment":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/media?parent=9009"}],"wp:term":[{"taxonomy":"project_cat","embeddable":true,"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project_cat?post=9009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}