{"id":9012,"date":"2026-03-27T23:00:37","date_gmt":"2026-03-27T20:00:37","guid":{"rendered":"http:\/\/kmc.test\/?post_type=project&#038;p=9012"},"modified":"2026-03-27T23:02:40","modified_gmt":"2026-03-27T20:02:40","slug":"projects-ref-2012","status":"publish","type":"project","link":"https:\/\/kmc.am\/en\/projects\/projects-ref-2012\/","title":{"rendered":"Works executed in 2012"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong><em>Customer\u00a0\u2013\u00a0Electrical\u00a0Network\u00a0of\u00a0Armenia\u00a0CJSC<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of open aerial transmission facilities in Yerevan and regions of Armenia: 4kV &#038; 10kV,<\/li>\n\n\n<li>Construction of closed (cable) transmission facilities in Yerevan and regions of Armenia:\u00a0 4kVand 35kV<\/li>\n\n\n<li>Importing of 35\/110kV line hardware<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Customer \u201cOrange-Armenia\u201d CJSC<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of open aerial transmission facilities in Yerevan and other regions of Armenia: 4kV<\/li>\n\n\n<li>Construction of closed (cable) transmission facilities in Yerevan and other regions of Armenia: 4kV<\/li>\n\n\n<li>Construction of rooftop mobile stations in Yerevan and other regions of Armenia<\/li>\n\n\n<li>Construction of \u00a0tower mobile stations (Greenfield) in Yerevan and other regions of Armenia<\/li>\n\n\n<li>GSM\/DCS\/WCDMA\/UMTS network deployment including BTS(vendor: NSN), power back-up systems(vendor: ELTEK) installation and commissioning, BTS upgrades, MW links installation and commissioning(vendor: ALU), MW links swap\/upgrades.<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Customer LLC \u201cSouth Caucasus Railway\u201d<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Capital repair of passenger platform Jrapi<\/li>\n\n\n<li>Capital repair of passenger platform Shirakavan<\/li>\n\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Customer\u00a0\u2013\u00a0Electrical\u00a0Network\u00a0of\u00a0Armenia\u00a0CJSC Customer \u201cOrange-Armenia\u201d CJSC Customer LLC \u201cSouth Caucasus Railway\u201d<\/p>\n","protected":false},"featured_media":0,"template":"","project_cat":[16],"class_list":["post-9012","project","type-project","status-publish","hentry","project_cat-power-construction"],"_links":{"self":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project\/9012","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:attachment":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/media?parent=9012"}],"wp:term":[{"taxonomy":"project_cat","embeddable":true,"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project_cat?post=9012"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}