{"id":9014,"date":"2026-03-27T23:00:37","date_gmt":"2026-03-27T20:00:37","guid":{"rendered":"http:\/\/kmc.test\/?post_type=project&amp;p=9014"},"modified":"2026-03-27T23:00:37","modified_gmt":"2026-03-27T20:00:37","slug":"projects-ref-2010","status":"publish","type":"project","link":"https:\/\/kmc.am\/en\/projects\/projects-ref-2010\/","title":{"rendered":"Works executed in 2010"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong><em>\u201cElectrical Networks of Armenia\u201d CJSC<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Substation Shahumyan 35-110kV<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Fence repair in \u201cShahumyan 1\u201d substation,<\/li>\n\n\n<li>Construction of grease trap in Shahumyan 1 substation,<\/li>\n\n\n<li>Substation building repair, heating, lighting systems installations,<\/li>\n\n\n<li>Substation building construction works,<\/li>\n\n\n<li>\u201cShahumyan 1\u201d substation repair.<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Substation \u201cHyusisayin\u201d 35-110kV<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Dismantling works of the Substation building 2<sup>nd<\/sup> floor<\/li>\n\n\n<li>Installation of cable trays and laying of pipes<\/li>\n\n\n<li>Installation of control panels and chargers<\/li>\n\n\n<li>Preparation of grease trap, grease outle, grease collector for the power transformer,<\/li>\n\n\n<li>Mounting of two gates for the substation fence<\/li>\n\n\n<li>Dismantling of portals and switches<\/li>\n\n\n<li>Reconstruction of control building, portal rooms and switches<\/li>\n\n\n<li>Substation portals foundations strengthening<\/li>\n\n\n<li>Installation of reactors for two transformers: reactor type &#8211; XKGKL-6-4000-<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Substation \u201cKentronakan\u201d 35-110kV<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Installation of reactors for two transformers. Reactor type: XKGKL-6-6000-6,<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Substation \u201cAbovyan\u201d 110\/35\/10kV<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Installation and assembling of 35kV portal beams.<\/li>\n\n\n<li>Installation of 35kV portal for the second transformer<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>\u201cOrange-Armenia\u201d CJSC<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of open aerial transmission facilities: 4kV-2km, 10kV<\/li>\n\n\n<li>Construction of transmission facilities closed and aerial. 4kV<\/li>\n\n\n<li>Laying of underground cables:\u00a0 10kV<\/li>\n\n\n<li>Construction of mobile stations in the territory of Armenia<\/li>\n\n\n<li>Construction of 35\/4kV substations in the regions of Armenia<\/li>\n\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>\u201cElectrical Networks of Armenia\u201d CJSC Substation Shahumyan 35-110kV Substation \u201cHyusisayin\u201d 35-110kV Substation \u201cKentronakan\u201d 35-110kV Substation \u201cAbovyan\u201d 110\/35\/10kV \u201cOrange-Armenia\u201d CJSC<\/p>\n","protected":false},"featured_media":0,"template":"","project_cat":[],"class_list":["post-9014","project","type-project","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project\/9014","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:attachment":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/media?parent=9014"}],"wp:term":[{"taxonomy":"project_cat","embeddable":true,"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project_cat?post=9014"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}