{"id":9015,"date":"2026-03-27T23:00:37","date_gmt":"2026-03-27T20:00:37","guid":{"rendered":"http:\/\/kmc.test\/?post_type=project&amp;p=9015"},"modified":"2026-03-27T23:00:37","modified_gmt":"2026-03-27T20:00:37","slug":"projects-ref-2009","status":"publish","type":"project","link":"https:\/\/kmc.am\/en\/projects\/projects-ref-2009\/","title":{"rendered":"Works executed in 2008 and 2009"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong><em>\u201cElectrical Networks of Armenia\u201d CJSC<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Repair and installation of accumulator batteries in substation 110\/35\/10kV \u201cEtchmiatsin\u201d,<\/li>\n\n\n<li>Repair and installation of accumulator batteries, construction of grease removal system, stormwater drain system and r\/c fence in substation 110\/35\/10kV\u00a0 \u201cAparan\u201d,<\/li>\n\n\n<li>Repair and installations of accumulator batteries and\u00a0 construction of grease removal system in substation 110\/35\/10kV\u00a0 \u201cShahumyan-1\u201d, OCP building capital repair<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>\u201cImexgroup\u201d LTD<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction and overall assembling of substation \u00a02x1000kW \u201cNar-Dos 68\u201d<\/li>\n\n\n<li>Construction and overall assembling of substation\u00a0 4x1000kW \u201cNorthern avenue\u201d<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>\u201cIntracom Armenia\u201d LLC<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of 8m and 30m mobile stations<\/li>\n\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong><em>Other  projects<\/em><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construction of open aerial transmission facilities: 4kW-8km, 10kW<\/li>\n\n\n<li>Construction of closed (cable) aerial transmission facilities:\u00a0 4kW<\/li>\n\n\n<li>Laying of underground cables: 10kW<\/li>\n\n\n<li>Construction of 40m mobile stations<\/li>\n\n\n<li>Construction and assembling of generators, substation and transmission facilities in 2mW Hydroelectric Power plant \u201cByurakan\u201d<\/li>\n\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>\u201cElectrical Networks of Armenia\u201d CJSC \u201cImexgroup\u201d LTD \u201cIntracom Armenia\u201d LLC Other projects<\/p>\n","protected":false},"featured_media":0,"template":"","project_cat":[],"class_list":["post-9015","project","type-project","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project\/9015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:attachment":[{"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/media?parent=9015"}],"wp:term":[{"taxonomy":"project_cat","embeddable":true,"href":"https:\/\/kmc.am\/en\/wp-json\/wp\/v2\/project_cat?post=9015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}